Boat Plans African Queen


Im getting a little closer... with finishing the paint that is.

The  roof is now painted and is all white and shiny. Too  shiny if you ask me, and I know for a fact that its going to be dangerously slippery once its outside and able to get wet. Ive always had a plan on doing a non slip  coating,  and I still do plan that treatment, but Im going to wait until next year prior to launch. I know Im going to do some damage to the roof paint during the finishing, so Ill repair those spots as I go and once shes in a punch out state of being, Ill final coat with non skid.

The roof was a pretty straight forward job: blast any rust spots and all grinder marks and welds to white metal, blast the whole surface to roughen, then two coats of epoxy primer, followed with three coats of Acrylic Urethane top coat. In order to make painting the super structure sides a bit easier, I painted under the soffit, and the side trim on the wheel house and salon. By painting down the super structure sides this small amount, I have a good spot to tape the roof off from and will have no visible parting line.

Its Saturday morning as I sit and type this update, and the super structure roof is taped off and covered with poly sheathing and tarps. Im getting ready to start the body work on the wheel house and I should have it ready to final blast sometime today or tomorrow. Taping and protecting the roof from the dust, grit and over spray from the final stage of work took me about two hours, but its done and off of the list. The next time I see the roof, all the painting will be finished, Ill be happy, and Ill be doing work directly related to getting her out of the barn.







Cheers 

Do you find information about Boat Plans African Queen are you looking for? If not, below may help you find more information about the Boat Plans African Queen. Thank you for visiting, have a great day.
Read More..

Plywood Boat Plans Australia | Painting is complete

| 0 komentar |

Plywood Boat Plans Australia


Like the post title says, the hull is finished painted.Whoo Hoo!!!!

My last post dealt with the port side of the boat, and this post deals with me wrapping up the starboard side of the hull and making a repair on the port side. But the jist of this post is that the paint work is completed, and I can put the paint pot back on the shelf until late August or early September.

I had to make two repairs on the port side of the hull. I prepped the two areas that needed to be re painted but I did not spray them until I sprayed the starboard side. The repairs were a result of a severe orange peel condition up by the bulwark, and a paint pot failure below the lower rub rail. The paint pot failure was some issue of the feed tube not  getting primed correctly or air locking up on me which caused the paint to not flow or atomize correctly. This below the rub rail area looked pretty rough, so I sanded it back smooth. The orange peel issue by the bulwark was a result of  me not leaving well enough alone.When I was painting this area of the hull a few weeks ago, I had lost track of how many coats I had sprayed on this area. I was unsure if I had two or three coats. The area looked good, and I should have left it alone, but being the rookie I am, I sprayed what I thought was a third coat. The prior coat had already dried, so when I applied the not needed coat, it instantly turned to crap and got a severe case of the orange peel. I started to wet sand it out, but the area was too big, and it was going to be faster to take it back down with the DA sander and re paint. Ill have to wet sand out the parting line, but that will be an easy almost relaxing job. Both areas now look good and Im glad I made the repairs. 

I cant really take a picture of the starboard side as there is only four feet of room from the barn wall the the boat. But I can tell you that the starboard side now looks like the port side, which is shiny and finished. I treated the starboard side the same way which entailed sanding the hull to 320 grit, spot priming some areas, painting the rub rail, then spraying three coats of green acrylic urethane. Ill have to do some wet sanding and polishing on a few areas, but I wont do any of that until next Spring at the launch site. Ill probably end up polishing and waxing all of the hull, but there again, none of that work will happen until next Spring or Summer just before launch.

I am sort of keeping a half baked schedule roaming around in the back of my head. While Im a week or so later than I wanted to be on finishing the painting, the painting is now complete and I can focus on moving forward. The next step is going to be getting her off of the building cradle. I found a dually truck axle for the rear of the boat and a truck steering axle for the front of the boat. No work is needed regarding the steering axle, but the dually is going to need some work before I set the boat down on it. One side of the axle is locked up and will need bearings and races, and I need to take hard look at the tires. I only have to move the hull about ten miles to the launch site, but the tires are so dry rotted, that I have my doubts about them. Once I have the bearings in them, I might bring the assembly up to the truck tire shop that sells me rubber for my trucks and see if they cant some used skins on the wheels. A halfway decent set of used rubber make me feel better about things than the dry rotted tires now on the axle.

The other reason I need to get her off of the building cradle is that I need the metal from the cradle to build a gantry and the frame for welding together the wheel house and salon. I have over 100 of 4" I beam in the cradle and quite a bit of 1/4" plate. All that will be put to good use for a gantry and frame work for the wheel house job, and will also mean I will not have to spend any money building those two items.

I need to be assembling the wheel house and salon by early July, and needed to be finished with the welding by the middle of August. Finished with the welding means having the hand rails for the salon top welded in place, the engine room exhaust funnel welded in place, the brackets for future paravanes figured out and welded in place, the mast step figured out and welded in place, the pad eyes for the mast figured out and welded in place, lifting rings figured out and welded in place, brackets for the yet to be built dink figured out and welded in place. Im sure Im forgetting a few odds and ends, but you get my drift in that time is running out. Having all this completed by mid August gives me a few weeks to finish painting the salon and wheel house, which puts me in to September, which is about when I need to be picking a date to move her to the launch site. The boat yard Im bringer her to gets busy in late October, so I want all of my work completed before that time and the high end yachts start piling up around me which will cause me trouble with painting.
















Cheers

Do you find information about Plywood Boat Plans Australia are you looking for? If not, below may help you find more information about the Plywood Boat Plans Australia. Thank you for visiting, have a great day.
Read More..

Boat Plans Bartender | Portuguese bridge is painted

| 0 komentar |

Boat Plans Bartender



I took half a day off yesterday and finished the painting the Portuguese bridge. Before I put all the paint gear away, I think Ill paint the aft deck bulwark and the two door jambs in that area. This way, all the off white painting will be finished until I have her at the launch site and install the wheel house and salon. Ill be able to get a good leg up on some detail work while shes in the barn and all the good tools are close at hand.

I had blasted and primed the Portuguese bridge, then faired grinder marks, the deck:PB joint, and seam sealed the frame to sheathing joint. Once I was happy with how the fairing looked, I spot primed those areas with two coats of primer to seal the porous fairing compound, which will help the top coat look more even. If I didnt seal the fairing compound, it would suck up the top coat paint, and make a pretty decent looking job look like crap.

Because of other things I had going on, I had to wait more than 72 hours to top coat the PB. If you wait longer than 72 hours, a chemical bond between the top coat and the primer will not happen, so you have to scuff the primer to get the top coat to bond to it. I use the red 3M scuff pads for this job, and they are made for just this application. I have a hook and loop dual action air sander, and I cut the scuff pads into a six inch diameter circles, they will now hook on to the sander and make quick work of a tedious job. Once the scuffing is completed, I blow the work off with my air compressor then tape and paper the area I dont want paint. I bought a tape/paper applicator at Lowes the other week, and I have to say that while the tool was fairly inexpensive, it did a nice job. It did such a nice job and made taping so much quicker, I have to recommend it as a tool one might want to consider purchasing for any paint work. That $17.00 tool paid for itself in no time on what I had just done.

The scribe line marking the wheel house layout was starting to get a little faint, so I decide to paint the wheelhouse deck using the wheel house scribe line as my layout. You can now see how the wheel house will fit in the scheme of things. The wheel house floor is going to be cork, so Ill use some less expensive metal primer and paint, and apply that will a roller. Ill glue down 1/4" plywood as a substrate, and apply the cork to that. Spraying the cheaper paints is not such a good idea as the paint tends to stay wet while its floating around the shop. Whatever it lands on it sticks to it. Because of the quick evaporating reducers Im using with the high dollar paint, the over spray acts like heavy dust when it lands in the barn. I still protect my new shiny paint from over spray, and if I do get some on a good finish, a little rubbing compound will take it quickly off. Not so with paint such as Rustoleum.

Now that this painting is finished, Im going to spend the rest of April getting some detail work completed. I have a some sand blasting guys stopping over so I can get an idea of what the cost of blasting below the water line will be. The sooner I get the bottom blasted the sooner I can barrier finish painting the hull. Getting the boat on a dolly is a big deal for me and I want it done well in advance of moving her to the launch site. Youll probably start to notice a consistent theme in my future posts, and that theme is going to be " getting her to the launch site".

One thing Im starting to realize is that this is a big boat. On deck shes 44, and over all she is 48. The living spaces and machinery spaces seem to go on forever, and the wheel house is huge. Once the wheel house and salon are in place, the displacement will begin to be felt. With the hydraulic bow thruster, I feel shell be able to be single handed, but I do feel shes close to needing an admiral.

So, heres to getting her to the launch site and seeing more shiny paint.

Do you find information about Boat Plans Bartender are you looking for? If not, below may help you find more information about the Boat Plans Bartender. Thank you for visiting, have a great day.
Read More..

Boat Plans Butler | Some painting complete

| 0 komentar |

Boat Plans Butler







I have finished painting the foredeck, the anchor pulpit, the handrails, the foredeck side of the Portuguese bridge, and the bulwarks. Pretty much, all of the fore deck is finished with paint. I did this on Friday, and due to some family things I have to do this weekend, I wont be able to finish the wheel house side of the Portuguese bridge and the outer deck of the wheelhouse until sometime this week. The weather forecast for this week is on the stormy side, so Ill be able to take off work the 1/2 day I need to finish painting what I did not get finished on Friday.

The fore deck was a lot of work to paint, and used about a gallon of paint. The paint mix is 5:1, so in terms of product used, I sprayed about 1.25 gallons. That might not seem like a lot of paint, but it is a fair amount given the paint type. The fore deck and handrails is a really cut up area to paint, and was a pretty physical day for me. At the end of the day, I was feeling the workout. This is one of those deals that you cant stop once you get started, so no matter how worn out you get, its best if you suck it up and finish.

Because I decided to paint the hand rails, I had to scaffold the outside. I have a rolling scaffold I used, but that required many trips up and down the scaffold as I moved around the boat. The rolling scaffold does not fit between the boat and the barn wall, so I had to set up a 16 walk board and a ladder to do that area. Slow, thoughtful movements are the key when working 12 off of the ground lugging around a full paint pot, air hoses and safety clothing. My basic paint plan was the same as all the other painting I did which involved getting a decent first layer of paint on the surfaces, letting it tack up a bit, then come back and apply a second and third coat. With the handrails, the exposed frames of the bulwark, the bulwark cap and underside, the anchor pulpit, hatch, and cabin ventilation tubes, there was a lot of trimming in that had to be done. All of the fixtures that I just mentioned not only required trimming, they also added some square footage. Most of this area was painted at odd angles, on my hands and knees, bent over while avoiding the roof trusss. I now have a better understanding on why certain boats are more expensive to build than others, and why items such as handrails, bulwarks, and the Portuguese bridge add costs to a job. Im so glad this job is completed.

Youll notice a cubby hole on the port side of the anchor pulpit. That recess is for my wash down hose connection and a connection for an air hose. Ill explain the air hose connection at some other time, but I felt like I wanted an air hose on the bow of the boat for maintenance.

The handrail is made of 1 1/2" stainless steel with 1" stanchions welded to the bulwark cap. I had intended to hand polish this rail and leave it as shiny stainless. Like I said in earlier post, I had serious doubt about being able to get the polishing job done well enough where the handrail would not be a constant battle with rust. I think I made the right choice in painting it. Im also happy knowing that when the rail gets chipped, it will not rust quickly due to the stainless.

The paint scheme Im doing on the boat is pretty similar to the picture at the top of the blog. Because of the Portuguese bridges white color, I carried that paint line around the outside of the hull. Its nice seeing some more shiny paint on the hull as I look up at it from the shop floor.

Like I said above, Ill finish inside the Portuguese bridge this week. Now that all this paint work is completed, I can get some more finish work done while the boat is in the barn. Ill be able to install the hatch, install the dorade boxes, install the Portuguese bridge door leading to the foredeck, and install the wood cap on the Portuguese bridge. Ill also be able to install the deck plates for the two water fills, and the gray water pump out station for the 50 gallon tank located in the guest cabin. I will install the bulkhead fittings for the anchor winch and the door on the pulpit.

Im not to happy about the quality of the finish on the deck. There was a fair amount of grit on the deck from the other painting, so Ill have to take a close look at a re paint. My goal was to get the deck protected with that tough paint Im using, and thats what I did. I plan on doing a non skid deck treatment, but that will not happen until launch time. Given the additional coatings I will be doing on the deck, I think Ill let it go until launch now that it has two coats of acrylic urethane and it can now handle weather and finish work.

Do you find information about Boat Plans Butler are you looking for? If not, below may help you find more information about the Boat Plans Butler. Thank you for visiting, have a great day.
Read More..

Boat Plans Arch Davis | Ive started painting the super structure

| 0 komentar |

Boat Plans Arch Davis


The interior of the super structure is painted and once again Ive discovered the hard way just how big a boat this is.

To begin, I am changing the paint schedule. After speaking with a commercial boat yard, they have me convinced to  only prime the interior of the super structure. The interior metal will get covered with closed cell spray foam then the liner will go over that. There is nothing such as UV or physical abuse that is going to break the primer down, so a top coat of paint is really not needed. I gave the interior a thorough blasting and applied three coats of epoxy primer.

Because I  have to weld the super structure to the hull, I taped off the the bottom edge of the metal so I will not have to grind away the primer later. Having the prime being burnt off by the welding is not only nasty, it can lead to the  primer gas mixing with the weld shielding gas and cause a defect in the weld. Porosity of the weld would be one example of a defect of this nature. Taping the joint is a heck of a lot faster and easier vs grinding.

Because paint over spray is not an issue with the interior, I decided to do this area first. Acting on the advice of some experienced paint people, I have taken a different approach to painting this part of the boat vs the hull. When I painted the hull, I blasted then primed, then started doing my fairing and filler work. The paint guys talked me into blasting the joints I want to do filler work, applying the filler, then blasting the rest of the metal then priming. Doing the work in this order will save me time as I will avoid some scuffing. This order of work will save me the most time on the roof. I  have a few areas I want to do some filler work on so I blasted those areas clean, and applied some filler. The filler work Im doing on the roof is more for function than for aesthetics. Ill sand those areas smooth, blast the rest of the roof, apply two coats of primer, and within the 72 hour chemical bond able time limit, Ill top coat the roof. No scuffing will be needed, and the more reliable chemical connection between primer and top coat is achieved.

The sides of the super structure is the area that everyone is going to see. For the sides, Im blasting all the joints and welds I want to fill over, then Im applying filler. Ill sand the filler smooth, blast the rest of the sides clean, and two coats of epoxy primer. While the primer is still hot, Ill apply two coats of sand able high build primer and long board that coat smooth. I know Ill be doing some more filler work on top of the high build, but thats  to be expected to get a nice finish. Once Im good with the high build surface ( my version of good is different than a professional body mans version). Ill spray another coat of primer to seal the high build, then top coat with my off white Acrylic Urethane. At this point the paint will be finished, and the list will be that much smaller.

Ill be posting updates as I work through the roof and sides.

The move to the launch site continues to get pushed back further. October seems doable, but early November seems more realistic. Once the paint work is finished, there is still work to be done here in the shop that will make the launch site assembly go faster. There is really no reason to slow things down by getting in a hurry. This is a big ass ed job, for one man to do by himself, and the time it takes is going to be the time it takes. I can only hope that the crap weather holds off until I have her dried in at the launch site, but Ive worked my whole life out in crap weather, so Im not to worried about me. I just dont want to compromises any work on the boat nor cost myself extra money.

Ill have the roof blasted and primed this weekend, and if all goes well, well have a off white roof to look at come Monday evening or Tuesday morning.

 






Cheers

Do you find information about Boat Plans Arch Davis are you looking for? If not, below may help you find more information about the Boat Plans Arch Davis. Thank you for visiting, have a great day.
Read More..

Boat Plans Arch Davis | Forward Cabin Framing

| 0 komentar |

Boat Plans Arch Davis




Im now walking around on a nice level floor. The floor feels very firm and is squeak free while only being fastened down with maybe 50% of the screws. Im very pleased with the amount of head room I ended up having. So now it is time to lay out the various partitions and interior walls. Just in case anyone is wondering, Im talking about the lower forward area of the boat in this post. The other thing I should probably say about boat building is that there are very few things that are plumb, level, or square on a boat. Certain things might look skewed or goofy, but thats just the way things work out on certain parts of a boat.

I have a two cabin layout in the lower forward area of the boat. The master cabin witch is amid ship on the engine room bulkhead, and and a cabin in the "V" for the kids. There is a shared shower and head between the two cabins and each cabin has its own sink. The spaces worked out better putting the sinks in the cabins vs a sink in the shower area. It might not make the most sense, but it made more sense to me to have sinks in each cabin.

Coming down the four steps from above one will stop at a landing. By turning left you will pass through a door and enter the master cabin witch measures 11 x 11. There will be a full size queen bed with drawers underneath, a sink/vanity on the right side along with vanity/dresser for Shannon also on the right side. On the left side will be a desk for me and a locker to hang things in. Bookcases and shelves will make up the wall above the bed, and a flat screen TV on the wall opposite the bed. A watertight door leads to the engine room on the left side of the bed and another door leads to the common shower/head on the right side of the bed.

If you choose to go straight vs left while standing in the stair landing, youll enter a hall leading to the "V" cabin area. In this hallway will be a small sitting area and a vanity with a sink. Past the vanity you enter the kids cabin with its bunk beds and storage underneath. There is room on the bathroom wall for a small TV, and there is also an opening hatch in the kids cabin. I laid out this cabin so there will be a bunk area and the hallway area, so people could have some privacy to change or be by themselves without having to go into the bathroom. The hallway/sitting room works out nice in my opinion and it gives this area a much needed private space.

There is a port light in the landing, a port light in the hallway/sitting room and two port lights ( port and starboard ) in the kids cabin. There is a port light in the bathroom, and two port lights in the master cabin. All the ports are fixed and cannot be opened. Ill post more on ventilation later down the road, but in a nutshell I have a hatch in the "V", and two six inch vents for the master cabin leading up through the wheel house. The bathroom has force ventilation leading up to the Portuguese bridge. The lower forward area will also have its own dedicated air conditioning system.

I framed the partitions with 2x3, and will sheath them in 3/8 Cherry veneer plywood. The outboard walls will get a 1x6 ceder plank, and the ceilings will be a painted bead board. I decided to frame now vs after the insulation because I think this is way makes more sense. Once the insulator gets finished with his work it will be extremely difficult to attach anything to the steel frames. I used screws to fasten all the framing together in case I needed to take something apart while I move forward with the finishing work. My insulator stopped by the boat one day recently and commented that I was getting a little close to the steel with some of the framing. He suggested I hold some parts of the framing a little farther away to give him some more room to work. The insulator also said Id be a lot of the lumber would still be clean when he left so more blocking could be added after he finished.

My next step is to layout all of my boxes for my 12v and 120v fixtures. Once I know where all my various light fixtures and appliances go, Ill run conduit and boxes similar to conventional house wiring only Ill use stranded wiring instead of the solid wire one would see in a house. I also will run as much of my waste and water lines along with anything else I feel comfortable having buried in the foam. Ive been using urethane adhesive to glue nailer blocks to certain parts of the hull on the recommendation of the insulator. He told me to go ahead and use only adhesive, because once he sprays that particular block into the foam, Ill not be able to get it out and that block will become part of the insulation. Because of the ease of just slapping some glue on a wood block and sticking it to the hull Im putting up blocks any place I remotely think I"ll need one.

Having the framing completed really closes the boat in. But for all of those who know boats I know youll appreciate when I say that the areas Ive created are very roomy and very comfortable. The "V" cabin is a little snug, but it still works good and Im able to move around with ease. Id love to have another 10 to work with, but I must say Im very happy with what I have and the spaces Ive created.

Conall

Do you find information about Boat Plans Arch Davis are you looking for? If not, below may help you find more information about the Boat Plans Arch Davis. Thank you for visiting, have a great day.
Read More..

Boat Blind Plans | More painting

| 0 komentar |

Boat Blind Plans







Ive been busy with life here at home and have been away from things boat building for a few weeks. I have been making some headway on getting a some paint work done so Ill update on that.

I want to get the fore deck and Portuguese bridge finish painted. I need the fore deck painted to install the forward hatch, and I just want to get things off of the list. Like all things boat building, the fore deck paint turned into more than I had figured. I dont know if projects are turning into more than I figured for, or if I just gave up getting in a hurry. I had sand blasted, primed and scuffed the fore deck last year so a large part of the prep work was completed. I decided to paint the stainless steel 1 1/2" hand rails vs polishing them, so I sand blasted the rails to give the primer something to grab on to. The Portuguese bridge was a mess and had to be sand blasted. I did not have to take the whole thing down to white metal, but at least 1/3 of that area did go to white metal.

Since I gave up getting in a hurry, I decided to fair some of the fore deck and Portuguese bridge. I ran an epoxy fillet between the bulwark and deck area, and the Portuguese bridge and deck area. I faired away the all the grinder marks and a some a few areas where you could see plate joints. I also faired the large deck joints. I faired the hawse openings on the fore deck where the dock lines will pass through, and the whole pulpit area. All the areas with fairing compound on them will have to get two more coats of primer before I spray top coat paint. I had thought about using high build prime, and blocking the fore deck and portuguese bridge back down, but thats a lot of work, and I dont think a mirror yacht finish is that important for these areas.

The frames that are welded to the decks and bulwarks or Portuguese bridge will be treated a little differently. No matter how careful I try to get that joint painted I dont think my efforts will be good enough. So for these areas, Im going to use and automotive paint product called seam sealer. Seam sealer is basically a caulk that will remain flexible, but will allow the top coat paint to stick to it. If you look inside your car trunk or under the hood, you will probably see where the manufacturer used seam sealer. Ive seen boats that are framed like mine, and most of them seem to have rust stains coming from joints like this. Im hoping this little bit of work and money will solve that problem.

After I finish sanding the faired areas, Im going to scuff all the paint with some 3m pads. I have a hook and loop DA air sander, and if I cut round shape on the 3m pads, I can hook the pads to the DA and save on some elbow grease. Once everything is scuffed, Ill apply the seam sealer then prime the seam sealed joints and all the un primed fairing compound. Once the primer is on, Ill have 72 hours to get the top coat paint on or Ill have to re scuff the newly primed areas.

My goals and schedule of work for the next five months is to finish the fore deck and Portuguese bridge paint, and install the forward hatch. Ive made arrangements for a sand blaster to blast below the water line so I can get the below the water line area barrier coated. Once that part of the hull is painted, Im going to scuff the hull and top coat paint it. At that point, the hull will be ready to leave the shop, so Ill be working on getting it on a dolly for the trip to the launch site.

If I want to get her in the water next season ( 2013) I really need her at the launch site by early October. October is the driest month of the year around hear, with that dryness carrying on in to November. October will be an excellent month to weld the wheel house and salon to the hull and have her dried in for the Winter. If I can meet that schedule, I will have the Winter and Spring to trim out the Salon and Wheel house and a 2013 launch will be doable.

I really love the fore deck and Portuguese bridge. The foredeck is large and uncluttered, and the railing is of a good height and stoutness. The Portuguese bridge is of a height that will make all on board feel secure as the boat is on passage. As I stand at the Portuguese bridge while the boat is in the barn, and dream of the future, I can almost see how the sea will look as the sun starts to dip below the horizon. The only problem Im having with these two areas is that they are a pain in the ass to paint. The barn has 16 ceilings, and these two areas are in the trusss, so one has to sort of stoop/walk to navigate this area. If you were to find yourself working on my build and on this part of the boat, I can almost guarantee you would crack your head numerous times on the trusss. Another week or so of sticking to this less than ideal job, and Ill be able to scratch this project off of the list I have been meaning to write.

Do you find information about Boat Blind Plans are you looking for? If not, below may help you find more information about the Boat Blind Plans. Thank you for visiting, have a great day.
Read More..

Pontoon Boat Plans Aluminum | Axle work

| 0 komentar |

Pontoon Boat Plans Aluminum






I started work on the axles to haul the hull to the launch site. The front axle for the hull will be a steering axle, and the rear will be a dual wheeled axle.

The reasons for sitting the hull on axles vs having it hauled by a commercial boat hauler are a few. The main reason for going this route are that I had two boat haulers look at the job and both did not want to make the trip down my driveway. Our driveway is fairly steep, greater than a 30% grade, and paved with gravel. For a truck pulling a heavy trailer, getting up it is also a challenge as the truck drive wheels will spin in the gravel and rubber gets torn off. The other reason for using a home made dolly to haul the boat is the clearance I have to have getting under a highway over pass. The over pass measures 16 exactly, and as the boat sits on the cradle she measures 15 11". Putting her on a trailer would raise her up over 16 and would require me cutting off the bowsprit handrail. Another reason for not using a commercial hauler is that I built the boat in the barn backwards. I should have built her bow forward pointing out the door. Getting her out of the barn will still require a dolly of some sorts given my ass backwards way of building her, so I might as well leave her on the dolly and haul her to the launch site myself. Why did I build her in the barn backwards? I have no idea, but I cant cry about it now.

Getting her on the axles has run into a snag. Ive finished the front steering axle, and its ready to go under the boat. My plan is to jack the hull up, sit the hull on to the  steering axle, then fabricate some stanchions to hold her steady. Ill then weld some two "D" rings to the hull and two "D" rings to the axle and use some chains and binders to hold her fast.

I had to fabricate a hitch/steering arm to make the front axle work the way I want. I used some 3" schedule 80 pipe for the hitch arm, and fabricated a pivot joint using 1 1/4" round stock and thick walled tube for bushings. I bored the tube on the lathe to .005 over the pin diameter to make things fit a little easier. The hitch arm will swing left to right, and by welding an arm to this and connecting that arm to the linkage on the steering axle, the wheels will "steer" and follow the hitch arm. Because I have to connect the hitch arm to the haul truck, I welded another pivot point turned 90 degrees to the steering pivot to allow the hitch to also move up and down. Basically, I created a home made "U" joint. Once the hull is out of the barn and I can figure out how long the up and down part of the hitch needs to be, Ill join the two together. Right now the hitch arm is about 4 long.

The snag I ran in to has to do with the dual wheeled axles for the rear. A friend gave me the axle but once I saw it up close I knew I did not want them in the shop as they were. This is a pretty old axle and it  had two piece wheels that were in bad shape and what I viewed as very dangerous. I called the tire shop that sells me equipment and they told me they could get me some used wheels and rubber that would be safe and make the trip to the launch site. When one is working on two piece wheels, the wheels should be place in a steel cage in case the lock ring on the wheel fails ( the two piece part of a two piece wheel) and blows apart. The mechanic at the tire shop must not have followed this practice as the wheel lock ring came off of the tire and hit him in the leg with enough force to break his leg. Hes lucky he still has his leg, and even more lucky hes alive. The tire shop is still going to finish the job and has promised me I can pick it up mid week. Once in the shop with newer radial wheels and rubber, Ill have to put a bearing and race in one side, and after that I can get the hull off of the cradle.

Getting her off of the cradle pretty much means most work on the hull is finished until she gets to the launch site. Once off of the cradle, my main focus will be to finish the wheel house and salon. Theres really not much more I can efficiently do to the hull so having her remain on the building cradle makes no sense. It will be easier to get her off of the cradle with the barn free of the wheel house so Im holding off on starting that build until the axles are in place. Also, once the hull is on the axles, shell be sitting about 18" out of level in regard to the water line, and I dont want to be working on her in that position.

Cheers

  