Boat Plans Bruce Roberts

The basic layout of the cabin area below is as follows: Down four steps from the salon above. Once at the bottom of the steps, you can either turn left through a door and get to the master cabin, or go straight through another door to get to the guest cabin dressing room/hallway. One has to go through this area to get to the guest cabin/kids cabin located in the forward area of the hull. Each cabin has a door to access the common bathroom where the shower and toilet is located. Each cabin ( master and guest) has its own sink. The engine room is accessed from the master cabin through a water tight steel door.
Standing in the guest cabin dressing room, one will find a large sink base with storage underneath, four wall mounted cabinets, and a bench seat with storage underneath it. There will be two ceiling mounted DC lights, and one ceiling mounted AC light with all lights being controlled by switches on the wall. There is also a decent amount of wall space available to have some hanging storage without impacting ones ability to walk through the space.

Because of my wish filled thinking regarding shower sump pumps, I had to re think how I was going to hold the gray water from the shower and cabin sinks. I decided to add a holding tank, and the most logical place for it was under one of the bunks against the dressing room bulkhead. I was going to buy a plastic tank, but since I had enough stainless plate left over from the water tank construction I decided to fabricate my own and save some cash. The tank ended up with 47 gallons of capacity.
Under the sink base in the dressing room is some of the gray water plumbing. The through hull fitting you see is above the water line. When we have to hold our gray water, the bl
ue valve will be shut and the black valve will be open. This will direct the water to the main sump which will then direct the water to the 47 gallon holding tank I just built. When we can discharge gray water, the blue valve will be open, the black valve will be closed, and the shower sump will discharge overboard via the black pipe when the sump selector valve is in that mode. Its a pretty simple set up albeit a bit on the bulky side, but I made everything from parts found in the shop and did not have to depart with any cash. The elbow on he end of the manifold is for the guest cabin dressing room sink once I get that sink installed.I built four more cabinets to fill up the wall in this room, and stopped them well short of the port light. One of the cabinets will be the medicine cabinet above the sink, while the other three will be general storage. The cabinets are 12 inches deep at the base, and about 18" deep at the top. Im also using t
hese cabinets as the chase for the air conditioning duct that will feed the guest/kids cabin. That duct will be a four inch flexible pipe.In order to give one as much privacy as possible, there will be a door between the dressing room and the bunk room. The door will be 20" wide.
I had enough room to create a bench in the dressing room so people could sit down while they were getting dressed. I installed a piano hinge on the lid of the bench so the bench could double as a locker for more storage.
The room is a fuzz narrow, but Im able to easily navigate through it without bumping my knees or having to turn the least bit sideways. I think this space will be an important part of the boat in regard to helping all on board with privacy, and a sense of having ones own space. To be honest, this is a very comfortable room even though its function is mostly utilitarian.
I have six doors to build for this room, and one more sheet of plywood to install on the partition between the master cabin and this space. I also have to plug all the screw holes, sand everything, and get a coat or two of finish on the wood.
Once those jobs are finished, Im ready to start work on the sleeping room and its four bunks. Once the doors are installed and some finish on the wood, Ill post some more pics.
Do you find information about Boat Plans Bruce Roberts are you looking for? If not, below may help you find more information about the Boat Plans Bruce Roberts. Thank you for visiting, have a great day.

uare footage on the floor since Ive raised the floor profile and allowed the plywood to "slide" more outboard against the frames. Its amazing how much more room I have since the sole grew outboard when I mocked up the sole framing system. Screwing the plywood directly to the steel in my opinion will make lifting pieces of the floor a real pain in the ass years down the road as screws rust and break. Ill end up with about 6 2" of headroom once the finished ceiling is installed. This 6 2" seems to be my minimum as some areas will be a little more ( 6 7" in some areas). Im 5 11" tall and Im totally happy with the headroom I"ll end up with.
he screw getting loose on the lumber, and a squeak developing. It if for all the reasons I just listed that I think the adhesive will give me some a little better job.
ing without having to remove any partitions. For this reason Ill have to frame the cabin sole in a way that allows the sole to be supported from below while the partitions remain in place. I also have to frame in all my access panels in the floor for access to water tank valves and whatever else I need to maintain below the floor. In a nut shell the cabin sole is basically made up of lots of small pieces that fit together to make the sole system.
various cabin partitions and cabin components. Once I new where most everything will go regarding living space, I will put layout lines down on the sole and alter the sole to accept the framing above. Doing it this way allows me days to ponder locations and do mock ups to see how things fit. Now is the time I start fighting for every square inch so I want to make sure it works for me and works for the boat. Most of the decisions Im making have me giving most of my consideration to how easy things will be to service and maintain.
d while not having your toes hit the drawers. It just makes the room feel more comfortable. The cantilever also made the bed/drawers attachment much easier along with fabricating the radius. Because I now have wires in the head board, it would not be too difficult to incorporate some small LED lights in the cantilever to illuminate the drawers if the lighting needed to be improved to see into the drawers.
for a place to install the lights. The mini columns turned into a support bracket for the book case rail, so this is how the book case came to be. I had to fix my screw up with the wire location, so I cut a dado in some stock, and made a wire chase that I screwed to the hull liner. The wood wire chases look OK, and was a much better alternative to removing the hull liner and pulling new wire.
and extended them up to an elevation lower than the cap of the Portuguese bridge. Because of the high bulwarks and me wanting the vent intake up where it will actually catch some air, I want to make sure the cowl is above the Portuguese bridge when Im finished . Ill fabricate some Dorade boxes to work with the 5" cowl vents Im looking for. When its all said and done, the air intake will be above the Portuguese bridge, and the cowls will look quite shippy. I primed and painted the below deck pipe work then glued some plywood on the below deck pipe ends to act as a nailer for the bead board ceiling. Because Im paranoid about sweating metal, I
wrapped the pipe in closed cell foam gasket material I had in the shop, and spray foamed the rest with some of those cans you get at the hardware store. Doing metal work in a finished section of the boat is a bitch and really slows me down, but this was something that had to be done. I also added a 12 volt fan in each corner of the cabin that will be controlled by their own switch. The kids cabin also has one four inch duct for air conditioning and heat when the weather calls.
of the two drawers so I built a cubby and installed a drawer front on the cubby. I installed two self closing cabinet hinges on this cubby/drawer along with a catch to hold the drawer front fast. The drawer unit is built against the bathroom bulkhead, and that angle turned out to be 28 degrees. Building the angled drawer was a challenge that took more time than one would figure, but I think the effort was worth it as this drawer added a fair amount of easily accessible storage. The drawer will have one inch of clearance as it slides past the bathroom door casing. The bathroom door will have to be closed
to use the drawer unit, but Im pretty sure it will be closed all the time since having the door closed makes the room just a fuzz larger.

he head if I ever decide to go with a toilet other than the composting unit. The four inch duct for the heat and AC that feeds the kids cabin and dressing room will also be in this chase. I think I have room to get the hydraulic lines for the anchor winch in this chase also, but that has yet to be decided. I really think the hydraulic lines will work well here, so maybe Ill just have to make that work.

ead mounted reading light on their own switch. There are also two 12v fans in each corner with their own switch. I also have a duplex 120 volt AC receptacle for a TV along with a coax box. The blue water line you see in ceiling headed towards the bow is for the anchor wash down.

inet style doors. They are what Id call frame and panel doors consisting of styles and rail pieces with a raised panel. These doors are overlay doors meaning the sit on top of the cabinets
fac
e frame vs a flush door that would fit within the face frame. Overlay doors are much easier to build and require a tenth of the precision t
hat flush doors require. The method of joinery Im using is called cope and stick. Basically one cuts a grooved profile in the panel side of all the styles and rails, then you cope the rail ( top and bottom horizontal pieces) to fit into that pr
ofile. The panel then floats in that frame you just created. Its a pretty nice looking door and adds a little more detail than one would get by using a flat plywood panel.
plywood for the panels. On the boat build, Ive decided to invest more of my time and build raised panels for all the cabinets ( well at least the cabinets in the master cabin and probably the galley). Because the raise panel is a solid wood panel, I had to build the doors to allow for seasonal movement of the panel. The air is pretty dry here now that we are in the late fall time, so if fit the panel on the loose side. I gave myself 1/4" gap all around the panel to allow the panel to "float" within the frame. I cut some pieces of 1/4" foam backer rod and stuffed the backer rod in to the groove of the style and rail before I assembled the door. The backer rod holds the panel centered in the frame while allowing it to expand and contract as humidity changes. After I get all the finish on the doors, I might go back and put a dab of glue in the center of the rail @ the center of the panel. Since wood expands across the grain, a little bit of glue at this location will allow th
e panel to expand while helping with any rattle I might get w
hen the door closes. If one would glue the panel tight all the way around the style and rail frame, it wouldnt be long before the expanding panel would destroy the frame. Before I assembled the doors I put a coat of finish on all the panels. If I didnt finish the panel prior to assembly, a line of unfinished wood would show up once the panel started to expand or contract. I clamped some boards to the edge of the work bench to help keep the doors square while I assembled them. I then checked the diagonals to assure the door was perfectly square before I clamped them.
ors stay shut. While the drawers have no pull hardware, Im thinking of installing some pulls on the doors.


giving some updates on the performance. A few of you out there might be thinking that Im jumping the gun by getting a working toilet on board at this stage in the game, but the truth is that Im psyched to have another place to sit and ponder.

o install the master cabin panels, and most of those will have to be plugged with bungs. Ill cut the bungs from scrap Cherry lumber, then part them on the table saw. Ill probably use a sharp chisel to pare the bung down close, then finish sand the bung with a DA sander to get it flush. Im a little worried about glue stains, but I think if I wipe each bung after tapping it home with a damp cloth, I should keep glue staining to a minimum. Im using a 1/4" x 1 1/4" batten to cover all the butt joints, so I wont have to bung those screws.
make the pathway between the bed and the sink more comfortable. Either way, Ill buy a sink this week and mock up a cabinet install to see how it fits in relation to the bed and being able to walk past the bed. Its important for me to feel comfortable as I walk around the cabin, and two or three inches in the right spot can make all the difference in how the room feels ( in my amateur opinion).


There are four bunks in the guest cabin. Each bunk is 6 6" long with a minimum width of 24". The overall average ceiling height in the cabin is 6 8". Underneath the lower bunks are two cubby hole frame less storage spaces. Underneath the port side bunk Ive added a large drawer, and one more not so large cubby. The 45 gallon gray water holding tank is underneath the starboard lower bunk so no cabinets were able to be built in that space. Between the port and starboard bunks is another cubby on the same elevation as the other lower cubbies. E
ach set of bunks has a bulkhead. Because of the the standard bunk length and the left over space I had after laying out the bunks, I created a large blanket chest forward of the two lower bunks. The blanket chest is a huge storage space, and all the linens for the cabin will easily fit in this space. All the linens for the rest of the boat could also go in this space. The lid of the blanket chest serves as a step to gain access to the anchor chain locker when one needs to get in to that area. Since Im using a deck winch, I see the anchor chain locker becoming storage for one thing or another. To both port and starboard of the anchor chain locker, I created four more cubbies that are
behind the bulkhead of each of the upper bunks.